N10(17HMR Drill Operations)
N15(EJD 2-22-08)
N20G40 G80 G90 G54
N25 M5 M9
N30 G00 X0. Y0. Z2.
N35 T1 M06  (Small Center Drill)
N40 M3 S1450 M8
N45 (Center Drill)
N50G81 X1.7958 Y0.7222 Z-0.020 R.05 F1 G99
N55 (X1.7958 Y0.7222 Z0.)
N60 X2.4363 Y3.1127
N65 X8.1443 Y0.8512
N70 X8.617 Y1.485
N75G80
N80 (Drill Start)
N85 M5 M9
N90 G00 X0. Y0. Z2.
N95 T2 M06  (.089 HSS Drill)
N100 M3 S1450 M8
N105G83 X1.7958 Y0.7222 Z-.525 R.05 Q.025 F.5 G99
N110 (X1.7958 Y0.7222 Z0.)
N115 X2.4363 Y3.1127
N120 X8.1443 Y0.8512
N125 X8.617 Y1.485
N130G80
N135 M5 M9
N140 G00 X0 Y0 Z2.0
N145 T3 M06  (.125 Endmill)
N150 M3 S1450 M8
N155G83 X1.7958 Y0.7222 Z-.195 R.05 Q.025 F.5 G99
N160 (X1.7958 Y0.7222 Z0.)
N165 X2.4363 Y3.1127
N170G80
N175 Z0.05
N180 G00 X0. Y0. Z2
N185M5 M9
